P&ID explained
What a piping and instrumentation diagram contains, how to read it and how it is created in a project – with a tap-through example and a symbol library.
In short: A P&ID (piping and instrumentation diagram; German R&I-Fließbild) shows all equipment, machines, piping, valves and instrumentation of a plant – each with its tag. It is the central document for engineering, construction, commissioning and operation.
Contents
Why a P&ID?
Before a plant is built, it has to be clear which line of which size goes where, where the isolation valves are, what is measured and controlled, and which safety devices exist. That is exactly what the P&ID records. Almost every other deliverable is based on it: line and valve lists, instrument lists, datasheets for purchasing, the control system specification, 3D piping design and hazard studies such as HAZOP.
In operation, the P&ID is the document operators and maintenance staff work with: which valve do I close to isolate this pump? Where is the safety valve? That is why it must always match the as-built plant.
BFD, PFD and P&ID
ISO 10628-1 distinguishes three types of flow diagram. They are produced one after another and become more detailed each time:
| Block flow diagram | Process flow diagram (PFD) | P&ID | |
|---|---|---|---|
| Purpose | Overview of the process | Process with main equipment and operating data | Complete technical design |
| Representation | Rectangles for process steps | Symbols for equipment and machines | Symbols for every item, incl. drivers and spares |
| Piping | Main streams as arrows | Flow paths with rates and conditions | Every line with number, size, rating, piping class |
| Valves | – | essential ones only | all, with tags |
| Instrumentation | – | key functions | all instruments per IEC 62424 |
| Typical stage | Study, proposal | Basic engineering | Detail engineering, construction, operation |
In power and energy plants, a heat balance diagram usually comes before the PFD. It provides the mass flows, pressures and temperatures that later appear on the PFD and P&ID.
Interactive example
A typical section: feedwater tank with level control, two feedwater pumps (one spare) and flow control to the boiler. Hover over an item or tap it.
What is on a P&ID?
- Equipment and machines with tags and key data (volume, duty, design pressure/temperature) – on the drawing or in a list, including drive motors and installed spares (e.g. “2 × 100 %”).
- Piping with line number, nominal size (DN/NPS), pressure rating or piping class, fluid, insulation or tracing. A new line number usually starts at a size change, at valves or at system boundaries.
- Valves: isolation, control, check and safety valves, each with tag and actuator type (manual, motor, pneumatic).
- Piping items: strainers, orifices, reducers, steam traps, silencers, drains and vents.
- Instrumentation and control with letter code and number, signal lines to controllers and final elements, safety functions.
- Limits and references: battery limits, scope breaks and connections to other sheets (“→ sheet 03 / C4”).
- Title block with document number, revision, author and checker.
Drawing rules (selection): flow from left to right and top to bottom where possible; tags next to the symbol, not inside; line labels above horizontal and left of vertical lines; the P&ID is not to scale, but vessels are drawn large enough to show all nozzles.
Reading instrument tags: PI, TIC, LIC …
Instruments are drawn per IEC 62424 as a circle (or oval) with letters and a number. A horizontal bar means the signal goes to the control room; without the bar it is a local indication only.
| First letter: measured variable | Succeeding letters: function |
|---|---|
| P pressure · T temperature · F flow · L level · Q quality/analysis · S speed · E electrical · W weight · PD differential pressure | I indicate · R record · C control · S switch · A alarm (H high, L low) · Z safety/interlock · Q totalise |
Examples: PI local pressure gauge · TIC temperature indicating controller · LIC level controller · FIRC flow indicated, recorded and controlled · LZA L safety trip on low level. The final element of a loop often carries the same number with V: LCV 101 belongs to LIC 101. In North America the ANSI/ISA-5.1 letter code is used; it is very similar.
Equipment tagging (KKS)
Every item needs a unique tag. In power plants the German KKS (power plant classification system) is widespread, internationally increasingly its successor RDS-PP. Other industries use their own schemes. A KKS tag reads like this:
│ │ │ │ │ └─ equipment number
│ │ │ │ └───── equipment type: AP = pump (AA valve, BR pipe, CP pressure measurement …)
│ │ │ └──────── numbering within the system: 10, 20, 30 … (e.g. parallel pumps)
│ │ └──────────── system: LAC = feedwater pump system
│ └─────────────── line / sub-plant
└───────────────── unit
The line in the example is 10LAB10BR001: feedwater piping system (LAB), first pipe (BR001).
Symbol library
The most common symbols per ISO 10628-2 and IEC 62424 – simplified drawings. Search by name or filter by group.
How a P&ID is created
- Process and balance: the block flow diagram is derived from the task; for energy plants the heat balance with mass flows, pressures and temperatures for all load cases.
- Process flow diagram: main equipment, flow paths and operating data are fixed, together with the key valves and measurements.
- P&ID: now all details are added – spares, drivers, every line with size and piping class, manual valves, drains, all instruments and safety devices. The P&ID is usually split into several sheets, e.g. by system.
- Review and approval: review with process, piping, electrical and I&C engineering plus safety study (HAZOP); every change gets a revision index.
- Lists and follow-up documents: line, valve and instrument lists, datasheets and the control system specification are derived from the P&ID.
The catch in practice: the same data is maintained by hand in many documents – flows from the balance, line sizes, tags. Every change has to be carried through everywhere. That is why Toolmeyer is building a tool chain on one shared data model: the heat balance tool computes the balance, the process flow diagram is derived from it, and the P&ID tool is in the works.
Common mistakes
- Missing spares, drivers or drains/vents – they belong on the P&ID, not only in piping design.
- Duplicate tags, or line numbers without size and piping class.
- Unclear flow direction, missing arrows at sheet edges, or references without a counter-reference.
- Instruments without clear assignment: which measurement drives which control valve?
- P&IDs not updated to as-built – dangerous in operation.
Frequently asked questions
Is a P&ID the same as an R&I diagram?
Yes. “R&I-Fließbild” (Rohrleitungs- und Instrumentenfließbild) is the German term for the same document.
Which standard applies to P&IDs?
ISO 10628-1 (types, content, drawing rules) and ISO 10628-2 (symbols); instrumentation per IEC 62424. In North America ANSI/ISA-5.1 is common. Many owners add their own company standards.
Which software is used for P&IDs?
Mostly CAD-based systems with a database in the background. For simple cases a drawing program with a symbol library is enough, but then the link to lists and calculations is missing.
What sheet size is used?
A1 is recommended. Larger plants are split over several sheets connected by references at the sheet edges.
Glossary
- DN / NPS
- Nominal pipe size, e.g. DN 100 (≈ NPS 4).
- PN / class
- Pressure rating of pipe, flange or valve, e.g. PN 40 or class 300.
- Piping class
- Defined combination of material, rating, wall thickness and components for a service range.
- I&C
- Instrumentation and control.
- Battery limit
- Point where a contractor’s scope of supply ends.
- HAZOP
- Systematic hazard study that goes through deviations line by line on the P&ID.
From heat balance to process flow diagram
In the heat balance tool you build the plant from blocks and compute the heat and pressure balance; the process flow diagram is derived automatically. The P&ID tool is the next step. Free, no sign-up. (User interface currently in German.)